Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 久久国产无码高清一区 | 无码精品人妻一区二区三区介绍 | 亚洲AV无码一区二区三区七次郎 | 国产欧美久久久精品四区剧情介绍 | 91探花精品偷拍在线播放 | 国产精品久久久久久无码一区二区 | 26uuu精品一区二区在线观看 | 日本视频免费在线观看 | 亚洲精品成人无码 | 91精品国产情侣高潮露脸仙踪林 | 午夜视频免费一二三区 | 性少妇videos欧美3d大片 | 欧美中文一区国产 | 国模国产在线视频无码 | 免费久久女人一级毛片视频 | 久久国产精品国产色婷婷 | 性感尤物波多野结衣插人 | 国产乱国产乱老熟500部视频 | 毛片黄片糖心免费在线观看 | 337P日本欧洲噜噜噜噜 | 蜜桃蜜臀色欲AV在线观看 | 国产黄A三级三级三级老师 农村寡妇高潮一级A片视频 | 裸体交性BBBBBBBBB| 老熟女老熟妇高清AAAAA片 | 亚洲熟妇色 777 | 久久久久久久久久久久久丁香 | 无码人妻精品一区二区蜜桃av | 无码人妻一区二区三区四区老鸭窝 | 成人a片免费体验区120秒 | 亚洲成色www成人网站妖精 | 香蕉影院在线观看 | 国产精品成人在线 | ,国产乱人伦真实精品视频 色情午夜 码一区二区 | 日本在线不卡免费中文 | 在线亚洲AV无码秘 蜜桃医院 | 精品 A片老师 | 中文字幕视频一区 | 丰满人妻AV不卡 | 成人A片视频在线播放 | 久久精品国产亚洲av无码麻豆 |